Chapter 4 documents the six-month stretch when Rackley Roofing had repeated opportunities to resolve the roof failure—and instead confirmed a pattern of avoidance, incomplete repairs, and undocumented findings. After offering a full “redo” on May 10 and performing it on May 28, Rackley replaced every fastener and resealed every pipe penetration. On paper, this should have reset the entire system. Yet every leak, stain, and attic photo from June forward occurred after this redo, making the failures post-repair, not pre-existing.

The turning point came on June 6—just nine days later—when Rackley’s own technician photographs captured darkened wood, moisture streaks, and early-stage rot inside the attic. These findings directly contradicted the later public narrative that no deterioration existed. Despite this evidence, the June 6 visit resulted only in a superficial sealant application. No written notes were provided, and no attempt was made to diagnose why a newly redone fastener system was already failing.

From June through November, five separate service visits followed the same script: attic inspection, brief roof work, vague verbal comments, and no written documentation. The staining deepened. Moisture spread. The substrate deteriorated. And each visit ended with a patch instead of a solution. When Rackley finally sent written communication in mid-November, it was a foam-closure proposal—an explanation inconsistent with six months of photographs and their own June 6 evidence.

By November 2024, the story was no longer about leaks. It was about a persistent pattern: ignoring documented evidence, denying deterioration they photographed themselves, avoiding written records, and treating symptoms long after causes were visible. Chapter 4 captures the season where silence, patches, and avoidance allowed the structure to decay under their care. Link to article

Previous
Previous

Rackley Roofing The Proof Series — Chapter 3: May 2024 — The Roof Fails, the Internal Emails, and th

Next
Next

Rackley Roofing-The Proof Series — Chapter 5: Foam Closures — The Moment Everything Shifted